User Manual

Warning
The meter is considered to be waste electronic
equipment within the sense of the European Directive
and must not be disposed of as household waste.
Dispose of the meter via the appropriate
channels.
Observe local and current legislation.
Dispose of used batteries at the designated
collection points.
Further documents regarding the disposal of the
product can be found at http://www.siemens.com/bt/
download.
Warning
The meter contains lithium batteries. Do not dispose of
the meter and batteries as household waste. Observe
local regulations and laws regarding disposal.
Warning
After lithium batteries have been used, you can return
them to the manufacturer for proper disposal. When
shipping batteries please observe legal regulations
which among other things govern the labelling and
packaging of hazardous goods.
Warning
Do not open the batteries. Do not bring batteries into
contact with water or expose to temperatures
exceeding 80°C.
Warning
The meter has no lightning protection. Ensure
lightning protection via the house installation.
3 Operating elements
Figure 1: Meter, closed
Figure 2: Meter, open
Number Description
1 Button 1
2 Button 2
3 Security stamp
4 Screw
5 Optical interface
6 LCD
7 Service button
4 Installation
Note
For a heat meter or combined heat/cooling
meter, the cold side installation location corresponds
to the return and the warm side installation
location to the supply .
Note
In the case of a cooling meter
, the warm side
installation location corresponds to the return and
the cold side installation location to the supply .
Proceed as follows to install the meter:
1. Compare the installation location with the symbol on
the LCD (
or ) to determine the installation
location. If necessary, adjust the installation location of
the meter to match the conditions (see chapter
"Changing the installation location").
2. Note the dimensions of the meter and check whether
there is sufficient free space.
3. Flush the system thoroughly before installing the meter.
4. Install the meter vertically or horizontally between two
gate valves so that the arrow on the body matches the
flow direction. Please note the following installation
examples.
Siemens Smart Infrastructure
A6V11905994 14.01.2020 10