Installation Instructions

4 / 4 2018-04-15 A6V11366643_----_a Siemens Building Technologies
Regulations for installation
The protective function must be properly installed to guarantee operation!
Connect the DIN rails per regulation to the rails for potential equalization in the building.
Refer to data sheet N2034 *) for notes on proper EMC installation.
Comply under all circumstances with polarity of protective components! The device for protection must
always be connected to the output of the transient protection.
*)
The documents can be downloaded from http://siemens.com/bt/download.
Key:
1
Lightning protection:
BXT BAS (base part)
BXT ML2 BD S 48 (lightning current/surge
arrestor)
Max. 20 connected meters
M-bus web server
M-bus level converter
2
M-bus
Max. 60 connected meters
Published by:
Siemens Switzerland Ltd.
Building Technologies Division
International Headquarters
Theilerstrasse 1a
630
0 Zug
Switzerland
Tel. +41 58
-724 24 24
www.siemens.com/buildingtechnologies
© Siemens Switzerland Ltd 2018
Delivery and technical specifications subject to change