Installation Instructions

Document No. 553-169T
Installation Instructions
July 22, 2015
Information in this document is based on specifications believed correct at the time of publication. The right is reserved to make changes as design
improvements are introduced. Product or company names mentioned herein may be the trademarks of their respective owners.
© 2015 Siemens Industry, Inc.
Siemens Industry, Inc.
Building Technologies Division
1000 Deerfield Parkway
Buffalo Grove, IL 60089-4513
USA
+1 847-215-1000
Your feedback is important to us. If you have
comments about this document, please send them
to SBT_technical.editor.us.sbt@siemens.com.
Document No. 553-169T
Printed in the USA
Page 5 of 5
Completing the Installation
CAUTION
If FLN is being used, do not connect
the shield wire to the connector.
Terminate only one end of the
shield wire on the enclosure earth
ground.
Terminal is connected to
reference wire. Protective ground
terminal may be connected to earth
ground.
NOTE:
Do not connect the power or network
communication cable until instructed to
do so during start-up.
1. Terminate power wiring to the 24 Vac removable
plug.
2. If FLN connectivity is required, remove the RS-
485 plug and terminate the communication
wiring. If running stand-alone, do not terminate
the plug
3. Terminate point wiring to the appropriate
connectors.
CAUTION
Adjacent point connections on the
TC Compact Series share a
Common connection. See Figure 2,
Common and Sensor Power
Connections.
For specific wiring diagrams, see the TALON Wiring
Guidelines for Field Panels and Equipment
Controllers (588-581).
The installation is now complete.