User's Manual

Industry Automation and Drive Technologies - SCE
TIA Training Document
Page 13 of 47 Module
E12
Status: 01/2010 Vision Sensor Shape Check with SIMATIC S7-300F 2PN/DP and VS120
4.1 Setting Up a New Project
1. The central tool in STEP 7 is the ’SIMATIC Manager’. It is called here with a double click (
SIMATIC Manager)
2. STEP7 programs are managed in projects. We are now setting up such a project
( File New)
3. Now, the project is assigned the ’Name’ ’VS120’ ( VS120 OK)