Data Sheet for Product

7
A6V11858276_en
--
_e
Smart Infrastructure
2021
-
08
-
06
Commissioning
When commissioning, check both wiring and functioning of the actuator.
Actuator stem extends Valve closes
Actuator stem retracts Valve opens
NOTICE
The actuator must be commissioned only with a correctly mounted valve in place!
Self-calibration (SSA161.05 only)
When operating voltage is applied, the actuator self-calibrates (fully retracted fully ex-
tended setpoint).
NOTICE
Correct calibration is only possible with valve stroke > 1.2 mm. Valve stroke < 1.2 mm
results in calibration failure.
If calibration fails, the actuator performs another calibration automatically after
10 seconds.
After three failed calibration attempts, the actuator stem remains in the extended posi-
tion.
Maintenance
The actuators require no maintenance.
WARNING
Operating voltage must be switched off during any maintenance!
NOTICE
When carrying out service work on the plant, note the following:
Switch off operating voltage.
If necessary, disconnect electrical connections from the terminals.
The actuator must be commissioned only with a correctly mounted valve in place!