Operating instructions
Commissioning a project
7.5 Transfer
MP 377, MP 377 PRO (WinCC flexible)
164 Operating Instructions, 10/2008, 6AV6691-1DR01-0AB0
Requirements
● The project "*.hmi" is opened in WinCC flexible.
● The HMI device is connected to a configuring PC.
● The data channel is configured on the HMI device.
● The HMI device is in "Transfer" mode.
Procedure
Proceed as follows:
1. On the configuring PC, select the "Transfer settings" command in the menu "Project >
Transfer" in WinCC flexible.
The "Select devices for transfer" dialog opens.
2. Select the HMI device in the left area of the dialog.
3. Select the type of connection between the HMI device and the configuring PC.
Set the connection parameters.
4. Set the transfer parameters in the right area of the dialog.
5. If you wish to transfer the compressed project file together with the runtime project to the
HMI device:
Select the "Enable backtransfer" check box.
6. Start transfer in WinCC flexible with "Transfer".
The configuring PC checks the connection to the HMI device. The project is transferred to
the HMI device. If the connection is not available or is defective, an error message is
displayed on the configuring PC.
Result
When the transfer is completed successfully, the project can be found on the HMI device.
The transferred project is then started automatically.
7.5.3 Starting automatic transfer
Introduction
If automatic transfer is activated, the HMI device automatically changes into "Transfer" mode
during operations as soon as a transfer starts on the configuring PC connected.
Note
With automatic transfer, the HMI device only changes into "Transfer" mode when the project
is running on the HMI device.
Automatic transfer is particularly suited for the test phase of a new project since transfer is
completed without interfering with the HMI device.