User manual
4-10
Distributed I/O System DP/ASi Link
EWA 4NEB 710 6055-02b
4.3 Commissioning
In this section you will learn what you have to take into consideration to
commission the DP/ASi link.
You commission the DP/ASi link in several steps.
Step
Action Note
1 Install and wire the ASi completely. Connect
the ASi power supply to the ASi cable.
Refer to the instructions for the different ASi
slaves and modules concerned to learn how
to install them.
The following assignment applies to the Sie-
mens ASi cable:
ASi cable + = brown
ASi cable – = blue
2 Install the DP/ASi link. Refer to section 4.1
3 Select the station number you are using. You can choose between EEPROM and DIP
switch block (refer to section 4.3.1).
EEPROM: refer to section 4.3.3
DIP switch block: refer to section 4.3.2
4 Connect the ASi cable to the DP/ASi link
M12 connector provided for it.
Refer to section 4.2
5 Connect the PROFIBUS-DP with a tee unit
to the DP/ASi link.
Refer to section 4.2
6 Connect the 24 V power supply for the DP/
ASi link to the remaining device connector.
Refer to section 4.2
7 Turn on the power supply. –
After you have connected the DP/ASi link in the specified order and have
turned on the power supply of the DP/ASi link, the DP/ASi link starts up au-
tomatically (refer to section 7.1).
In this section
Sequence
Automatic start-up
Installing and Wiring the DP/ASi Link