Specifications

Wiring
5-19
Distributed I/O Device ET 200M
EWA-4NEB780600602-06
Wiring the Front Connector
Table 5-4 Wiring the front connector
Step 20-Pin Front Connector 40-Pin Front Connector
1. Thread the cable strain-relief assembly
into the front connector.
2. Do you want to bring the cables out at the bottom of the module?
If so:
Start with terminal 20, and wire the
terminals in the following order:
terminal 20, 19, ... 1.
Starting at terminal 40 or 20, wire the
terminals alternately (i.e. terminals 39,
19, 38, 18 etc. down to terminals 21
and 1).
If not:
Start with terminal 1, and wire the
terminals in the following order: terminal
1, 2, ... 20.
Starting at terminal 1 or 21, wire the
terminals alternately (i.e. terminals 2, 22,
3, 23 etc. up to terminals 20 and 40).
3. Also tighten the screws of any terminals that are not wired.
4. Thread the cable strain-relief assembly
into the front connector.
5. Pull the cable strain-relief assembly tight. Push the retainer on the strain-relief
assembly in to the left; this will improve utilization of the available space.
1
2
1
2
4
3