Operating instructions
Table Of Contents
- SICLOCK® TC 100 Plant Central Clock
- Overview
- Safety notices
- Preface
- Table of Contents
- 1 Safety instructions
- 2 Description
- 3 Hardware description
- 4 Operation planning
- 5 Mounting
- 6 Connection
- 7 Configuration Tool
- 8 Parameter assignment and operation of the device
- 9 Parameter assignment
- 10 Parameter table
- 11 Service and maintenance
- 12 Messages
- 13 Technical data
- 14 Dimension drawing
- 15 Circuit diagrams
- 16 Spare parts / accessories
- A Annex
- B ESD guidelines
- C List of icons
- D Glossary
- Index

Operation planning
4-2
© Siemens AG 2010 All Rights Reserved
SICLOCK
®
TC100 Operating Instructions
4.3 Unpacking and checking the delivery
The device is completely assembled, tested and packed in the factory, and has
no internal transport locks.
If there are large temperature differences between the means of transport and the
unpacking site, we recommend leaving the device in its transport packaging to
avoid harmful condensation.
Procedure
• Please check the packaging material for transport damage upon delivery.
• If any transport damage is present at the time of delivery, lodge a complaint
with the responsible shipping company. Have the shipper confirm the trans-
port damage immediately.
• Unpack the device.
• Keep the packaging material in case you have to transport the device again.
• Please keep the accompanying documentation in a safe place. You will need
the documentation when you start up the device for the first time.
• Check the package contents for completeness and any visible transport
damage. Check for completeness using the enclosed "Contents of Delivery"
list.
• Notify the responsible delivery service immediately if the packages contents
are incomplete or damaged.
Notice
The packaging protects the device during transport and storage. Transport the
device only in its original packaging!
Warning
Ensure that a damaged device is neither inadvertently installed nor brought into
operation.