User Manual

Building Technologies/HVAC Products CE1M5195xx 16.01.2007 3/18
en
English
Prerequisites
For a complete SED2 IP21 installation, the following items are required, depending on frame size:
Frame size SED2 AC 200…240 V
3 phases / IP20
SED2 AC 380…480 V
3 phases / IP20
SED2-IP21
cover
D
SED2-11/22B…SED2-18.5/22B SED2-18.5/32B…SED2-30/32B
SED2-IP21-D/E
E
SED2-22/22B…SED2-30/22B SED2-37/32B…SED2-45/32B
SED2-IP21-D/E
F
SED2-37/22B…SED2-45/22B SED2-55/32 B…SED2-90/32B
SED2-IP21-F
Mounting notes
To ensure correct mounting of the SED2 variable speed drive and the IP21 cover, read these instructions carefully
before starting the installation
Use the SED2-IP21 cover only when mounting the SED2 on a wall, to increase the degree of protection of the
equipment from IP20 to IP21
Mount the equipment in a clean, dry and lockable room
Do not install the SED2 with IP21 cover in a space open to the public
Mount the SED2, and especially the IP21 cover above it, on a flat wall
Mount the SED2-IP21 cover strictly according to these instructions and the drilling plans shown for frame sizes D…F,
thus ensuring that the standards for degree of protection IP21 and protection against electric shock
(EN 60529) will be met and that the SED2 will safely operate
Mounting
1. Mark the boreholes for the SED2 and the IP21 cover on a flat wall according to the drilling plans shown below.
2. Drill the holes according to the fixing screws listed below and fit the SED2 including the EMC footprint filter to the wall.
We recommend to use the following mounting material:
Frame size
SED2 Variable speed drive /
IP21 cover
Mounting material
SED2
4 wood screws 8 mm dia.
4 washers M8
D
SED2-IP21-D/E
2 wood screws 6 mm dia.
2 washers M6
SED2
4 wood screws 8 mm dia.
4 washers M8
E
SED2-IP21-D/E
2 wood screws 6 mm dia.
2 washers M6
SED2
4 wood screws 8 mm dia.
4 washers M8
F
SED2-IP21-F
2 wood screws 6 mm dia.
2 washers M6
3. Fit the IP21 cover
Note: If a flat wall is not available for fitting the IP21 cover, use a sealing band between the wall and the cover to
ensure that condensation, if any, cannot penetrate the SED2.
Also observe the SED2 Commissioning Guide (CM1G5192en), chapter 4 EMC-compatible installation of
SED2 and, especially subsection 4.4.1 Potential equalization and earthing.