Installation Instructions
Document No. A6V11139222
Installation Instructions
March 20, 2017
Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and
models as design improvements are introduced. Other product or company names mentioned herein may be the trademarks of their
respective owners. © 2017 Siemens Industry, Inc.
Siemens Industry, Inc.
Building Technologies Division
1000 Deerfield Parkway
Buffalo Grove, IL 60089-4513
USA
+1-847-215-1000
Your feedback is important to us. If you have
comments about this document, please send them
to SBT_technical.editor.us.sbt@siemens.com
Document No. A6V11139222
Printed in the USA
Page 2 of 2
6. If the digital energy meter is powered, verify
that the CT LED next to the wired CT terminal
block is GREEN. If it is RED, verify that the CT
is on the correct phase and/or is installed with
the label printing on the CT facing toward the
wire direction of the power source, not the load.
After it is corrected, the LED will change to
GREEN.
7. You are now ready to begin your monitoring
session.
Figure 2. Connect White Wire to Positive (+) Terminal.
Connect Black Wire to Negative (-) Terminal.