Installation Instructions

Document No. 129-554
Installation Instructions
September 10, 2014
Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and
models as design improvements are introduced. Other product or company names mentioned herein may be the trademarks of their
respective owners. © 2014 Siemens Industry, Inc.
Siemens Industry, Inc.
Building Technologies Division
1000 Deerfield Parkway
Buffalo Grove, IL 60089-4513
USA
+1-847-215-1000
Your feedback is important to us. If you have
comments about this document, please send them
to SBT_technical.editor.us.sbt@siemens.com
Printed in the USA
Page 2 of 2
3. Push the connector back together. The
conductor should be in the inside of the CT
Window. See Figure 2.
4. Repeat Steps 1 through 3 if you are using more
than one CT.
5. Connect the brown wire on the CT to the
negative (-) terminal on the measuring device.
See Figure 3.
6. Connect the white wire on the CT to the positive
terminal (+) on the measuring device. See
Figure 3.
7. Connect the bare wire to the shield (S Terminal).
This reduces interference and improves the
accuracy of the CT. See Figure 3.
8. If the digital energy meter is powered, verify that
the CT LED next to the wired CT terminal block
is GREEN. If it is RED, verify that the Rogowski
Coil is on the correct phase and/or is installed
with the arrow pointing toward the load. After it is
corrected, the LED will change to GREEN.
Figure 3. Connect Brown Wire to Negative (-)
Terminal. Connect White Wire to Positive (+) Terminal.
Connect Bare Wire to Shield (S).