Basic Documentation

59 / 87
Siemens Actuators SAX.., SAY.., SAV.., SAL.. for valves CE1P4040en
Smart Infrastructure Functions and control 2020-01-30
After synchronization the actuator follows the control signal again.
4.7.1.1 Active forced position input on Z
If after return to automatic mode a signal on Z is active (GND, AC/DC 24 V or
0…1000 Ohm) the ClosedPosition-Synchronization is deactivated as long as the
signal on Z remains.
After Z is deactivated the ClosedPosition-Synchronization will be performed.
ClosedPosition-Synchronization is only automatically activated after manual
operation. A power failure does not activate this function automatically, to avoid that
all actuators in a section close in parallel.
If the customer likes synchronization also after a power failure he should take care
that the plant restarting routine drives the actuator automatically into an end
position. This will also synchronize the internal position control and the real
position.
4.8 Calibration
To match the actuator to production-related mechanical tolerances of the individual
valves, accurate positioning and position feedback must be ensured, if calibration
is performed when the plant is commissioned (page 43). During commissioning,
the actuator detects the valve’s end positions and files the exact stroke in its
internal memory.
Calibration takes place in the following phases:
· Actuator drives to H
0
(1), valve closes. Detection
of upper end position.
· Actuator drives to H
100
(2), valve opens.
Detection of lower end position.
· The detected values are stored (3). Then the
actuator follows the positioning signal.
Note