1.5 What activities does this document
describe?
The flow chart below is a simplified illustration of the handling of a project for the
integration of DESIGO RXC into a management system – from the specification and
tender documentation to engineering and commissioning.
Specifications
Preparation
for tender
Quotation
Formalization of room
installation and
network structure
Ordering of materials
Room partitioning,
control loops,
interfaces etc.
- NIDES templates
- Hardware list
- NIDES templates
- Addressing
Configuration in
COLBAS format
Engineering with RXT10
VISONIK
engineering
Project data,
devices,
connections
Commissioning and
operation
8338Z14D
In the flow chart above, the activities related to VISONIK have been highlighted. The
table below provides a brief description of these:
Activity VISONIK-specific elements
Preparation for tender
Available system functions, NIDES binding
templates for VISONIK, hardware list
Engineering with the RXT10
(room-level engineering)
Addressing (location text), NIDES binding
templates for VISONIK
VISONIK engineering
(Integration into the system level)
Creation of a configuration in COLBAS format.
Commissioning and operation Loading VISONIK BPS with the COLBAS
configuration, completion of the configuration
and testing of system functions
These activities, specific to VISONIK, are not described in the related literature listed
below. They are the subject of this manual.
Project handling
from start to finish
Activities described