User Manual
79/90
Building Technologies Integration of DESIGO™ RXC CM2Z8338en_01
Building Automation Commissioning 12.06.2006
5 Commissioning
5.1 Overview
This section describes the commissioning procedure for the integration of DESIGO
RXC into VISONIK. The key points are as follows:
• Commissioning procedure
• Indication and operation
• Procedure for updates and modifications
5.2
Commissioning procedure ..........................................................................80
5.3 Commissioning procedure (workflow).........................................................81
5.4 Status indication in the commissioning phase............................................82
5.5 General options for operation .....................................................................83
5.6 Structure of the TEC data points.................................................................84
5.7 Operation of the HVAC groups ...................................................................85
5.8 Operating the blind and lighting groups ......................................................86
Introduction
Contents of this section