User Manual

63/90
Building Technologies Integration of DESIGO™ RXC CM2Z8338en_01
Building Automation Engineering 12.06.2006
4.10 Example with HVAC, blind and lighting
groups
The following is an example of a floor plan, incorporating DESIGO RXC controllers for
the room management system.
TCR 1 TCR 2
RXC
33
37 38
39 40
41 42
T
34 35 36 43 44
T
TCR 6
TCR 5
TCR 3 TCR 4
RXC RXC RXC RXC RXC
RXC RXC RXC RXC
RXC RXC
01021DE
Ware-
house
P
roduction
Offices
South
North
East
The system example incorporates the following diagrams:
Groups
Description
HVAC Production area, offices (HVAC zones North and South)
The warehouse is not defined as a group (separate area at constant
temperature)
Blinds Production area, warehouse, North façade, South façade, East façade
and entire floor
Lighting Production area, warehouse, offices and entire floor
The edited version of TSK112 for this system example is shown on the next page. The
following details relate to the edited file:
Groups Description
HVAC TSK112 does not include TCR 6 (RX43/44), as it is not a group.
TED
The TED groups are “independent” of the HVAC groups. Four groups
have been defined here, on the assumption that the North and South
zones each have 2 energy distribution systems with:
Heating, water (EFORM = 0) and Cooling, water (EFORM = 1).
Blinds Group numbers, from 1.. 100
For each group, a priority is entered, which should reflect the
importance of the group’s function within the overall system. For
example, the warehouse has been assigned a lower priority than the
floor as a whole.
Lighting Group numbers, from 101.. 200
Priorities assigned according to the same principles as for blinds.
TTY Not edited. TTY1 is assigned to the NIDES.RX (default).
System example
Groups in the
system example
Notes on the entries in
TSK112