User Manual

55/90
Building Technologies Integration von DESIGO™ RXC in VISONIK CM2Z8338en_01
Building Automation Engineering 12.06.2006
The diagram below shows the workflow for the integration of DESIGO RXC into
VISONIK.
BPS
NIDES.RX
LON bus
BLN (SDLC)
V.24
RxNibps.col
V
ISONIK
general
GroupConfig.col
RXT10
Project data
Infolist
90161Aen
1
2
3
VISOTOOL
The various stages in the workflow diagram involve the following activities and results:
Stage Activities/Outcome
1 Creation of the project (room level) with the RXT10, including: Here:
Entry of location text for the devices in compliance with VISONIK
addressing.
Use of NIDES binding templates VISONIK 1 and 2.
Outcome:
When saving the projects, the RXT10 creates the following files:
“Project data”: Image of the relevant LON network with all devices,
applications, parameters and connections.
"RxNibps.col." export file for the BPS, comprising:
TSK111 : Project image for BPS
TSK110 : Infolist for NIDES.RX
2 Definition of groups:
"GroupConfig.col" consisting of:
TSK 112 data for HVAC, blind and lighting groups.
This data should be adapted specifically to each project with the VISOTOOL
Editor.
3 VISONIK engineering of the BPS:
Loading of CFE software CFE_V2_x_y.col
Loading of project data RxNiBps.col and GroupConfig.col
Other VISONIK engineering (TEC master functions, time program, text
commentary and additional tasks and points.
At the commissioning stage, project data is loaded onto the LON network with the
RXT10 tool, and VISONIK-specific files are uploaded into the BPS with the VISOTOOL
Editor.
The following pages provide detailed information on each stage.
Overview
Stage-by-stage
description
What happens next?