Basic Documentation
225/256
Siemens Modular Heating Controller RMH760B CE1P3133en
Building Technologies 15 Communication 2017-09-29
Time switch
DHW zone = 2
Controller 2
DHW zone = 1
Controller 1
RM..
RM..
DHW time switch zone = 1
Time switch operation =
Slave
3131Z13
Time switch
Time switch operation =
Master
15.5 Heat demand and load control
Heat demand and the load control signals are exchanged via the heat distribution
zones.
Main menu > Commissioning > Communication > Distribution zones
Operating line Range Factory setting
Heat distr zone source side*
---- / 1…31
----
Heat distribution zone
1…31
1
Heat distr zone consumer side**
---- / 1…31
2
* The operating line is only displayed on the main controller
** The operating line is only displayed on the primary controller
A
3133S87
B
C
A
Heat distribution zone, heat generation side
B
Heat distribution zone, consumer side
C
Heat distribution zone
The 3 heating circuits and DHW heating are ready connected to the main controller,
which means that they cannot be operated by the primary controller, but only parallel to it.
The primary controller also is ready connected to the main controller and cannot be
operated parallel to the main controller.
The main controller in turn is ready connected to the boiler. The heat distribution zone
on the heat generation side need be set only when there is no boiler.
During boiler operation, the heat demand is acquired via the heat distribution zone. If
no main controller is used, its plant elements, such as mixing valve and pump, will not
be needed.
Communication