User Manual

Functions
Control sequences
4
70 | 146 A6V11545892_en--_a
Hydraulic and control diagram of the 6-port control ball valve loop
W Room temperature setpoint
YH Control command "Valve" (heating)
YC Control command "Valve" (cooling)
Kv Flow through the valve
Default Integral action time TN is fix to 45 minutes.
When the thermostat is set with control sequence “H/C ceiling with 6-port control
ball valve”; only the Y10 output can be used to control the 6-port control ball valve.
Output voltage range of Y10 can be configured via P201. For details, see Overview
[ 75].
P201 = 6 6-port valve (DC 0…10 V control signal)
P201 = 7 6-port valve (DC 2… 10 V control signal)
P201 = 8 Inverse signal, 6-port valve (DC 10… 0 V control signal)
P201 = 9 Inverse signal, 6-port valve (DC 10… 2 V control signal)
When the thermostat is set with control sequence “H/C ceiling with 6-port control
ball valve”, the fan control will be set as disable and cannot be changed.
The parameter P350 (Fan control) is set to 0 and cannot be change.
YH
YC
Kv
W
Y
Control output
configuration
Fan control