Data Sheet for Product
Table Of Contents
5
Siemens
A6V12005486_en--_c
Smart Infrastructure
2021-05-17
*)
The documents can be downloaded from http://siemens.com/bt/download.
For the maximum number of actuators in parallel, refer to information in the data sheets of
the selected actuators and to this list, depending on which value is lower:
● Parallel operation of max 6 SS… actuators (3-pos) is possible.
● Parallel operation of max 10 On / Off actuators is possible.
● Parallel operation of SQS35 is not possible.
Mechanical design
The thermostats consist of 2 parts:
● Front panel with electronics, operating elements and built-in room temperature sensor.
● Mounting base with power electronics.
The rear of the mounting base contains the screw terminals.
The base fits on a square conduit box with 60 mm fixing centers.
Slide the front panel in the mounting base and snap on.
Operation and settings
1. Operating mode selector
2. Change fan operation
3. Adjust setpoints and control parameters