Installation Instructions

Document No. 129-900
Installation Instructions
June 7, 2012
Mounting the Sensor/Manifold Assembly
(Continued)
2. Ensure that the sensor is mounted vertically. The
conduit cap may be positioned to face left, right,
front or back.
SEN0634R1
Figure 6. Unapproved Mounting Positions.
3. If air bleeding is desired:
a. Carefully loosen the two nuts of the
compression fittings assembled to the sensor.
See
Figure 7.
NOTE: While holding the fitting body with the
9/16” wrench, loosen the nuts with the
1/2” wrench.
SEN0638R1
Compression Fitting
Nuts for Bleeding
Figure 7. Compression Fitting Nuts Location.
b. Carefully tighten the nuts after bubble-free
media flows out.
The installation is now complete.
Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and
models as design improvements are introduced. Product or company names mentioned herein may be the trademarks of their respective
owners. © 2012 Siemens Industry, Inc.
Siemens Industry, Inc.
Building Technologies Division
1000 Deerfield Parkway
Buffalo Grove, IL 60089-4513
USA
+1-847-215-1000
Your feedback is important to us. If you have
comments about this document, please send
them to SBT_technical.editor@siemens.com
Document No. 129-900
Printed in the USA
Page 3 of 3