Commissioning Instructions

94 / 134
Siemens Synco™ living CE1C2740en
Building Technologies Commissioning the system 13.12.2010
Setting “Refrigeration distribution zone“ is visible only when ”Yes” was
selected with parameter ”2-pipe system heating/cooling“ in the basic
configuration, or "Radiator/floor cooling" was selected in a room for pa-
rameter "Cooling type".
Setting the refrigeration distribution zone enables the central apart-
ment unit to respond to H/C changeover forwarded by a refrigeration
source.
Exit the "Commissioning" menu
Press the Esc button to exit the “Commissioning” menu after commissioning.
The plant is not yet operating.
When you confirm this message by
pressing the
Menu/ok button, the plant
starts operation according to the new
settings and the display returns to the
”Main menu”.
Caution!
Plant starts