Commissioning Instructions

85 / 134
Siemens Synco™ living CE1C2740en
Building Technologies Commissioning the system 13.12.2010
Room groups 1 and 2 (flow sensor, return sensor, mixing valve, room group
pump):
Main menu > Commissioning > Wiring test
> Room groups > Room group X > …
Cooling release output (rooms 1 - 12):
Main menu > Commissioning > Wiring test
> Cooling release output > Room X
Ventilation inputs (humidity sensor, indoor air quality sensor, fireplace mode,
ventilation contacts 1 - 2):
Main menu > Commissioning > Wiring test
> Ventilation > Inputs > …
Ventilation outputs (step selector, HR bypass):
Main menu > Commissioning > Wiring test
> Ventilation > Outputs > …
DHW (QAX913 only): DHW sensor, DHW pump/valve and electric immersion
heater):
Main menu > Commissioning > Wiring test > DHW > …
Switching group relay (QAX913 only): Switching group 1 – 8):
Main menu > Commissioning > Wiring test
> Switching group relay > Switching group X
Faults (QAX913 only): Fault input 1 – 8, fault output 1 – 2):
Main menu > Commissioning > Wiring test > Faults > …
Supervision (QAX913 only): Supervision contact, supervision state, water
shutoff valve, gas shutoff valve, status output 1 – 4):
Main menu > Commissioning > Wiring test > Supervision > …
Inputs (Operating mode, summer operation, cooling enable, H/C changeover,
dew point, absence, QAX913 only: Twilight):
Main menu > Commissioning > Wiring test > Inputs > …
Outputs (heat demand relay, heat demand DC 0..10 V, refrigeration demand
relay, refrigeration demand 0..10 V, summer operation, cooling enable, win-
dow/door state, exhaust hood):
Main menu > Commissioning > Wiring test > Outputs > …