Commissioning Instructions
54 / 134
Siemens Synco™ living CE1C2740en
Building Technologies Commissioning the system 13.12.2010
Due date
This setting allows you to specify the date (day.month) when the meter values
each year are saved on a due date for billing purposes. The due date applies
to all meters.
Main menu > Commissioning > Extra configuration
> Meter > Due day date:
Factory setting 31.12
Synergyr apartment
In a partial migration of a Synergyr plant, the unit (---, 1..96) must be set to the
value of the address plug for the WRV8x or WRI80 you want to replace.
Main menu > Commissioning > Extra configuration
> Meter > Synergyr apartment:
Factory setting --- (no unit, just general meters).
Identification number
An 8-digit ID can be set for each meter. We recommend using the ID printed
on the meter (serial number).
When using M-bus meters, the set ID must match that of the M-bus
secondary address of the M-bus meter. The secondary address nor-
mally is identical to the printed serial number of the M-bus meter.
Main menu > Commissioning > Extra configuration
> Meter > … > Ident number:
Factory setting 00000000
Enter/edit ID number
Identification numbe
r
Use the arrow buttons to set the se-
lected number. Press Menu/ok to se-
lect the next digit of the 8-digit ID.
When you press the Esc button, a final dialog is displayed to store the new
value (Menu/ok button) or to cancel the setting (Esc button).
Impulse sensor type
When connecting meters, use the impulse input to set the type of impulse
sensor type.