Commissioning Instructions
50 / 134
Siemens Synco™ living CE1C2740en
Building Technologies Commissioning the system 13.12.2010
Extra configuration
As the basic configuration does not cover all required settings, more detailed
entries are required for the following topics via the "Extra configuration" menu:
• Rooms
• Ventilation
• Meters
• Faults
Rooms
Assign rooms to room groups
Per default, all 12 rooms are assigned to room group 1. For this room group, a
common flow temperature is calculated.
You can assign individual rooms to a second room group for which an inde-
pendent flow temperature is calculated.
Main menu > Commissioning > Extra configuration
> Rooms > Room X > Room group:
Room group 1 Room assigned to room group 1 (factory setting).
Room group 2 Room assigned to room group 2.
Cooling release output
Specify how the cooling release output of the respective room is controlled.
Main menu > Commissioning > Extra configuration
> Rooms > Room X > Cooling release outp:
--- Inactive – cooling release output not needed
(factory setting).
Via RF/S-mode Cooling release output via:
• Relay output Qx of an RRV91.. heating circuit
controller or RRV934 multi-controller.
• RF adapter plug KRF960.
• S-mode object on KNX TP1 *.
Q1 (local) Use relay Q1 of the central apartment unit as a
cooling release output.
* Connection of the respective S-Mode objects of the central apartment unit to the relevant S-Mode de-
vices on KNX TP1 via commissioning tool (ETS).