User Manual

3 / 124
Siemens Synco™ living CE1C2707en
Building Technologies 23.08.2008
We congratulate you
… on the selection of the Siemens Synco™ living system and thank you for
purchasing the central apartment unit!
The present document describes how to mount and commission the central
apartment unit and the other system components.
First, please ensure that you become familiar with the operating philosophy of
the central apartment unit. Operation itself is covered by the Operating Istruc-
tions (B2707en).
Symbols
The following symbols are used in this document:
The “caution“ symbol marks important information that you must
observe to ensure safe operation of plant.
The “info“ symbol refers to special information, notes and practical
tips relating to settings and operation of the central apartment unit
and the system.
This symbol refers to disposal notes.
Setting values and predefined values
When commissioning the system, the parameters activated use predefined
settings. The document differentiates between guide values and factory set-
tings.
Guide value: Recommended setting for the majority of plant.
Factory setting: Setting which can be changed to meet user- or plant-
specific requirements.
Use the boxes provided to enter the settings made when commissioning the
plant.
Siemens Switzerland Ltd
Building Technologies Group
International Headquarters
Gubelstrasse 22
CH-6301 Zug
Phone +41 41-724 24 24
Fax +41 41-724 35 22
www.siemens.com/sbt
© 2006-2008 Siemens Switzerland Ltd
Subject to change