User Manual
ABT-SSA (Setup & Service Assistant)
User interface overview: Installation
2
31 | 76
Siemens
A6V10429119_en--_a_07
Building Technologies
2018-12-19
1. Click (overwrite with priority=8).
The icon changes to . Manual operation with and is enabled.
2. Click or .
The positioning value is increased or reduced in increments of 10%. The switching value is changed.
The stage value is increased or reduced. The blinds are up or down.
3. Click to release overwriting.
Note: The symbol indicates a faulty value. The tooltip contains the cause (out of service or alarm).
Commanding at priority=1
WARNING
Commanding at priority=1 ( ) overrides life/plant safety functions!
Overwriting the priority or using incorrect values may trigger system malfunctions
which may result in injuries or property damage.
● Use commanding at priority=1 ( ) only if you can check the consequences.
● Release overwritten values as soon as possible. Click to release
overwriting.
Note:
● A higher priority (1-7) must be active to command at priority=1 ( ).
● If priority=1 ( ) is active then a simultaneous active priority=8 ( ) can be released but NOT be reenabled.
Logging test results
1. Click to display the State drop-down list for the point being tested.
2. Select the applicable test result from the drop-down list. (Failed or Passed).
3. Do one of the following:
– If the result is Failed, select a reason from the Comment drop-down list and complete the Tested by and
Assigned to fields.
Note: The comment is transferred to the ABT project following read back of data.
– If the result is Passed, complete the Tested by field.
4. Click Save to save your changes and collapse the row.
Note: The result is stored as a new entry in the commissioning history event log.