Owner`s manual
52
ProLINE-RoadRunner Operator’s Guide A
Run the Self-test procedure
approximately once a week.
To run the Self-test procedure:
1. Press Pause or end a job if
running.
2. Clear all devices from the
sockets and from the conveyor
belt.
3. Toggle the power switch Off and
then back On.
The Self-test will run, checking
the condition of the
components.
4. Check the display for system
errors.
Running the Self-Test
1
> Job
Advance Pocket
Align Pocket
3