Installation Instructions
Document No. 550-980
Installation Instructions
March 12, 2009
Page 2 of 5 Siemens Building Technologies, Inc.
Installation
1. Disconnect power.
2. Install barrier onto backplate.
Figure 3. Installing the barrier.
3. Run wiring up through backplate to terminals.
Figure 4. Routing I/O wiring.
4. Connect wiring to power and I/O terminals.
Figure 5. Power Wiring.
Figure 6. FLN Wiring.
Figure 7. Wiring I/O to terminals.