Installation Instructions

Installation Instructions
Document No. 129-173
Rev. 2, August, 2000
Positioning Relay Mounting Kit No. 147-279
Page 1 of 3
Product Description
This kit contains the parts needed to field mount the
RL 147 Positioning Relay on a 1/2 to 4-inch Super
Flowrite™ valve or a 12-inch Flowrite valve
manufactured before March 1978 with an actuator
Part Number 672-075, 672-076, or 672-077.
Product Number
147-279
Required Tools
Medium flat-blade screwdriver
Two 7/16-inch (11 mm) open-end wrenches
Expected Installation Time
10 minutes
Prerequisites
Clean, dry, oil-free air supply
147-2000 Positioning Relay
Measure the stem travel of the Super
Flowrite valve or locate the stem travel for
the 12-inch Flowrite stem in Table 2.
Know the desired spring range of the valve
Installation
1. Attach the relay mounting bracket (1) to the
lower housing of the valve actuator with the
clamp (8) provided. The lower edge of the
bracket must be against the lower housing
extension.
2. Attach the relay to the mounting bracket with
two captive screws furnished on the relay body.
Loosen the cover screw to remove the cover for
access to one of the screws.
3. Attach the feedback arm to the lever assembly
on the relay using the two screws and two lock
washers provided with the relay. The feedback
arm must clear the mounting bracket and the
actuator lower housing.
Figure 1. Positioning Relay Mounting Kit 147-279.
Table 1. Mounting Kit 147-279.
Item Description Qty
.
1 Mounting bracket 1
Feedback spring- small cadmium plate
Part Number 147-289
2
Feedback spring-small red
Part Number 147-290
2
2
Feedback spring-large green
Part Number 147-291
1
3 Adjusting screw 4-1/2" (115 mm) long 1
4 Wing nut 2
5 Lock washer 1
6 Flat washer 1
7 Spring arm 1
8 Sure-tite clamp 1
9 90° elbow connector 1
4. Loosen the lower hex nut on the valve stem
with an open-end wrench and slip the spring
arm between the hex nuts.
Discontinued

Summary of content (3 pages)