User Manual
CA2N1652E / 11.1998 Siemens Building Technologies
2/4 Landis & Staefa Division
Construction
PB3 base unit comprising:
1 Base unit with 7 connection terminals
2 Switch assembly with 4 connection terminals for fan control.
The above is designed to snap into position.
Not shown: Temporary transparent cover (recyclable PET) to protect the
base unit and the connection terminals during the construction phase.
PBAS electronic assembly, comprising
3 Printed circuit board with rotary knob for setpoint adjustment
4 Unit cover
Mounting
Mounting instructions (Ref. 35642) are enclosed with the operating unit.
The room operating unit may be flush-mounted in a wall box or screwed
directly onto a wall.
When using the built-in temperature sensor, the following must be noted:
• Mount in the occupied area, approximately 1.5 m above floor level and
at least 0.5 m from any adjacent wall
• Do not expose to direct sunlight
• Do not mount on external walls, in recesses, behind curtains or in the
vicinity of chimneys, doors and lamps.
See sheet 1659 for dimensions and further mounting instructions.
PBAS terminal layout
∆w
50939
1
2
3
4
5
6
7
L
I
II
III
1
2
3
4
PBAS
t
RA
PB
Room temperature sensor
Room temperature sensor (SGND)
Setpoint adjustment (SGND)
Setopint adjustment
Service bus (SGND)
Service bus (PB-Service)
Fan control switch
Service socket (FCC telephone socket)
for use with PRONTO IRC only
60156
3
4
1
2