User Manual

CA2N1653E / 11.1998 Siemens Building Technologies
2/4 Landis & Staefa Division
Construction
PB3/C1 base unit comprising:
1 Base unit with 7 connection terminals
2 Snap-on switch assembly with connection terminals.
Not shown: Transparent, recyclable cover (PET) to protect the base unit
from accidental physical contact and from dirt and dust while building
works are in progress.
PBAS/C1 electronic assembly, comprising:
3 Printed circuit board with rotary knob for setpoint adjustment
4 Unit cover
Mounting
Mounting instructions (Ref. 35642) are enclosed with the operating unit.
The room operating unit may be flush-mounted in a wall box or screwed
directly onto a wall.
When using the built-in temperature sensor, the following must be noted:
Mount in the occupied area, approximately 1.5 m above floor level and
at least 0.5 m from any adjacent wall.
Do not expose to direct sunlight.
Do not mount on external walls, in recesses, behind curtains or in the
vicinity of chimneys, doors and lamps.
See sheet 1659 for dimensions and further mounting instructions.
PBAS/C1 terminal layout
Room temperature sensor
Room temperature sensor (SGND)
Setpoint adjuster (SGND)
Setpoint adjuster
Service bus (SGND)
Service bus (PB-Service)
Service socket (FCC telephone socket)
for use with PRONTO IRC only
60156
3
4
1
2
w
60176
1
2
3
4
5
6
7
L
III
1
2
3
4
PBAS/C1
t
RA
PB
Switch contact AC 230 V / 6 (2) A
for use as required