User Manual
CA2N1653E / 11.1998 Siemens Building Technologies
2/4 Landis & Staefa Division
Construction
PB3/C1 base unit comprising:
1 Base unit with 7 connection terminals
2 Snap-on switch assembly with connection terminals.
Not shown: Transparent, recyclable cover (PET) to protect the base unit
from accidental physical contact and from dirt and dust while building
works are in progress.
PBAS/C1 electronic assembly, comprising:
3 Printed circuit board with rotary knob for setpoint adjustment
4 Unit cover
Mounting
Mounting instructions (Ref. 35642) are enclosed with the operating unit.
The room operating unit may be flush-mounted in a wall box or screwed
directly onto a wall.
When using the built-in temperature sensor, the following must be noted:
• Mount in the occupied area, approximately 1.5 m above floor level and
at least 0.5 m from any adjacent wall.
• Do not expose to direct sunlight.
• Do not mount on external walls, in recesses, behind curtains or in the
vicinity of chimneys, doors and lamps.
See sheet 1659 for dimensions and further mounting instructions.
PBAS/C1 terminal layout
Room temperature sensor
Room temperature sensor (SGND)
Setpoint adjuster (SGND)
Setpoint adjuster
Service bus (SGND)
Service bus (PB-Service)
Service socket (FCC telephone socket)
for use with PRONTO IRC only
60156
3
4
1
2
∆w
60176
1
2
3
4
5
6
7
L
III
1
2
3
4
PBAS/C1
t
RA
PB
Switch contact AC 230 V / 6 (2) A
for use as required