User's Manual

Connecting up
4.5 Assembling an IE hybrid cable 2 x 2 + 4 x 0.34 with an IE IP 67 hybrid connector
SCALANCE W788-xPRO/RR / SCALANCE W74x-1PRO/RR
98 Operating Instructions (Compact), Release 08/2007, A5E00413342-05
Remove the assembled data module from the IDC
assembly tool.
Position the top shield plate and press it over the cable
shield.
Position the lower shield plate and press it and the
upper shield plate together until they lock together with
an audible "click".
Arrange the power leads and insert them as far as they
will go into the hinge elements of the isolation body.
The following table shows the assignment of the power
leads.
Wire color code (standard) Brown Brown Black Black
Function 24 V 48 V PoE Ground Chassis
PoE
Power supply insert module 1 2 3 4