Operating instructions
Issue B1 3 Commissioning
MICROMASTER 420 Operating Instructions
6SE6400-5AA00-0BP0
37
3.2.2 Commission Overview with BOP or AOP
Prerequisites
Mechanical and electrical Installation are completed.
NOTES
We recommend the commissioning according this scheme.
Setting the motor frequenc
y
DIP Switch 2: Off = 50 Hz / ON = 60 Hz
Quick Commissioning P0010 = 1
See Section 3.2.3
Further Commissioning via P0004 and P0003
An overview of the parameter structure is given in
Section 5.3
For a detailed description of the parameter, see the
Parameter List.
Power ON










