Operating Instructions
17 Siemens Industry, Inc.
Verification and Communication Overview
▪ Can be modified with power applied to the meter.
Tools
Typical Work
• Tablet, Smart Device (Web Page
Based), or
Laptop computer (ViewPoint HD
Software)
• On site troubleshooting
• Multi Meter, Current Clamp
• Camera
• Locate the power meter
• Confirm RTU device
• Add wire terminations (if required)
• Confirm meter communication
settings
• Meter health metrics (check for setup
errors)
• Analytics (ViewPoint HD)
• Correct instrumentation
• Set alarms
• Set security PINs
• Checklist
RTU Programming and Scripting Overview
Tools
Typical Work
• Laptop PC (Remote Access to RTU)
• Remote troubleshooting
• Register List
• Confirm meter communication
settings
• Confirm communication protocols
• Exercise remote connectivity
• Run configuration scripting
• Set alarms
• Set security PINs
• Confirm data integrity