Operating Instructions

Siemens Industry, inc. 38
STEP 3. Mount conduit fittings, conduits, and blanking plugs.
STEP 4. Connect voltage leads
DO NOT ENERGIZE METER WITH VOLTAGE COVER REMOVED.