Installation Instructions

Document No. 540-627
Installation Instructions
April 29, 2007
bracket) to the rear plenum port (
Figure 7).
Connect the other plenum port to the D/P meter
plus (+) port (
Figure 8).
Figure 8. Plus (+) port on back of meter.
7. Push the I/O button on the meter to turn it on.
(
Figure 9).
Figure 9. D/P Meter connections outside case.
Attaching Plenum to the RPT
8. Place the mouth of the plenum over the holes on
the Remote Pressure Transmitter cover plate
(
Figure 10).
Figure 10.
9. Turn the plenum clockwise (Figure 11) until the
plenum rests snugly on the cover plate supports
(the plenum will be parallel to the sides of the
cover plate when it is snugly attached).
Figure 11.
Double-check all connections before starting the
calibration procedure.
You have successfully setup the Remote Pressure
Transmitter Calibrator. Please see the DPM Start-Up
Procedures on InfoLink for step-by-step instructions
on performing the calibration procedure.
Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and
models as design improvements are introduced. Other product or company names mentioned herein may be the trademarks of their
respective owners. © 2007 Siemens Building Technologies, Inc.
Siemens Building Technologies, Inc.
1000 Deerfield Parkway
Buffalo Grove, IL 60089-4513
U.S.A.
Your feedback is important to us. If you have
comments about this document, please send
them to
SBT_technical.editor.us.sbt@siemens.com
Document No. 540-627
Country of Origin: US
Page 3 of 3