Installation Instructions

Document No. 546-14402
Installation Instructions
December 8, 2011
Siemens Industry, Inc. Page 3 of 6
CAUTION:
Ferrite filter(s) must be installed on the
Operator Display Panel (ODP) cable. If not,
the controller is not FCC and CE compliant.
10. Plug the Operator Display Panel cable into the
Operator Display Panel Communication port on
the controller board (Figure 6 and Figure 7).
Figure 6. Fume Hood Controller Board Wiring (Application 903: Single Vertical Sash Configuration).
CAUTION:
The ferrite filter must be installed on the
cable inside the enclosure to meet FCC and
CE requirements (Figure 7).