Installation Instructions

Installation Instructions
Document No. 546-00085
December 8, 2011
CE Compliant Fume Hood Controller
Application 941 and 942
Item No. 546-00085. Rev. CA Page 1 of 7
Figure 1. CE Compliant Fume Hood
Controller(Standard enclosure).
Figure 2. CE Compliant Fume Hood Controller
(Otherenclosure).
Control Applications
941 and 942
Product Description
The Fume Hood Controller Board (Figure 1 and
Figure 2) is the main termination board for the Fume
Hood Controller. The board comes with a ferrite filter
to suppress electrical emissions from the 8-
conductor cable. The ferrite filter must be installed to
meet FCC requirements and CE compliance
Product Numbers
546-00705
CE Compliant Fume Hood Controller
Application 941 and 942 with cover
and mounting rail
546-00705E
CE Compliant Fume Hood Controller
Application 941 and 942 with FHC
enclosure
NOTE:
Keep the controller board in its static
proof bag until you are ready to install.
Warning/Caution Notation
WARNING
CAUTION
Expected Installation Times
23 minutes.
Required Tools and Materials
Smallflat-blade screwdriver
Prerequisites
Fume Hood Controller Enclosure is mounted
and wiring has been roughed-in.
Operator Display Panel is installed and
cable pulled to location of controller.

Summary of content (7 pages)