Commissioning Instructions

Before You Begin
Verifying Power
6
Siemens Industry, Inc. Start-up Procedures 140-1342
Restricted 2015-11-09
CAUTION
A separate power supply is required if a 4-20 mA sensor is used.
Failure to follow wiring precautions will result in equipment damage.
Verifying Power
1.
Verify that the controller has 24 Vac power and that the fuse has been inserted
into the trunk or that power to the transformer is ON.
2.
Verify that the Basic Sanity Test (BST) LED on the controller flashes once per
second.
Verifying Slave Mode Application Number
1.
Plug the cable into the micro USB port.
NOTE:
Drivers for the ODP II port must be loaded to your computer prior to being
able to communicate with the ODP II. Drivers can be found on the Technical
Support Website.
2.
Verify that Application 6700 (Slave Mode) is running at the controller.