Specifications
CP143 H1 / TCP/IP manual Commissioning
Rev. 00/07 6-25
Re:5. TransferbasedatatotheCP
You can select one of two methods to transfer the base data into the CP: you may write the data to
an EPROM or you may transfer the data via the serial interface to the respective CP. Here we will
transfer the data directly via the serial interface. First you have to connect your PC with the CP 1.
Load the data base CP1.NCS for station 1. Check the data by selecting the respective window from
Init and connections. If the data is correct you may transfer it to the CP. Select the function
Database (Datenbasis)
↔
CP from the menu item Transfer and the dialogue window for remote
configuration will be displayed:
Fig. 6-15: Serial configuration
Select Serial and enter the the port address 2F8 and the interrupt 03. Press the “Enter” key or click
on [OK]. You are now in control of the CP if the port address and the interrupt are valid.
STOP the CP to start the transfer of data. Request the status from the CP to check your actions.
In this example we will transfer the data directly from the NCS. Click on the button [NCS→
→→
→CP].
Once you have verified your action the data will be transferred directly to the CP. The connections
will be activated when you change the CPs status back to RUN.
Use the same method to transfer the database into the CP of station 2. The data communication link
will be activated as soon as the data has been transferred and both CPs are RUNning.
You may now monitor the configured connections by means of the VIPA-MC5 package. The
respective actions are described in chapter 6.4.6.