Specifications

IP 240 Operation
5 Operation
Before startup you must set various coding switches on the module.
You can stipulate
interrupt generation with switchbanks S1 and S2 ( Section 5.1)
disabling of the digital outputs with switchbank S4 ( Section 5.2)
encoder signal matching with switchbanks S5 and S6 ( Section 5.3)
The locations of the switchbanks and the fuses are shown in Fig. 5-1. The switch settings in the
figure are factory setttings.
Fig. 5-1. Locations of Switchbanks and Fuses
on
off
on
off
on
off
off on
off on off on
Fuse for 5 V encoder supply
S2 S1
S3
S5
S4
S6
F1 D1
F2 D2
F3 D1
F4 D2
Channel 2
Channel 1
F5
Fuses for digital outputs
EWA 4NEB 811 6120-02
5-1