User Manual

6 / 7
Siemens Schweiz AG
Industry Sector – Building Technologies Division
Gubelstraße 22, CH-6300 Zug, Switzerland
Press Relations: Petra Krokowski
Phone: +49 69 797 81327
E-mail: petra.krokowski@siemens.com
Siemens AG
Industry Sector – Building Technologies Division
Friesstraße 20, 60388 Frankfurt
(in Kasten in den Text)
The new PUMA headquarters at a glance
Construction: November 2007 until July 2009
Plot size: 49,801 m
2
Floor space: 34,565 m
2
Enclosed space: 173,500 m
3
Employees: 700
Architect
Klaus Krex, da capo al fine Architekten, Nuremberg
Overall planning for HVAC, sanitation, and electrical systems
Haustechnik Planungs GmbH, Nürnberg
Instrumentation and control/building automation engineering
IPM Gebäudeleittechnik GmbH, Feucht
Building specifications
Heat from district heating 2,000 kW
- Heating load—static heating approx. 850 kW
- Heating load—HVAC systems approx. 1,150 kW
- Heating requirement in summer (separate heat exchanger) approx. 50 kW
Air volume of all ventilation systems: approx. 500,000 m
3
Heat pumps for concrete core temperature control 2
- Heating capacity 290 kW
- Cooling capacity 450 kW
Chillers 7
- Cooling capacity—sales areas 526 kW
- Cooling capacity—office A/C 2,490 kW
- Cooling capacity—IT 400 kW