User Manual

20/28
Siemens Reservation and energy management CM110602en
Building Technologies Energy management with FOS 09/30/2008
4.4 Dialog boxes
4.4.1 "Control of Energy Groups" dialog box
This dialog box is used to define and review the order of priority of the energy groups.
The following describes the operations associated with each element of the dialog box.
Fig. 4-2: "Control of Energy Groups" dialog box
The list on the left contains all the energy groups with a priority number greater than 0.
Priority 0 ("Renovate") is the status for rooms undergoing redecoration or repairs. An
energy group with this status does not appear in the list of rooms to allocate.
The list on the right displays all Priority 0 energy groups.
The list is in order of priority (with the highest priority at the top and the last at the
bottom).
Provision must be made for the following special case:
Where two energy groups have the same priority, they should be shown in the same
order as in the database.
Î
Only active if an energy group is highlighted in the list in the left pane. Click the
button to assign Priority 0 ("Renovate") to the selected energy group and move
it to the right pane.
Í
This button reverses the process. Click to move a Priority 0 energy group to
the end of the list in the left pane thereby assigning it a positive value. The
button is only active if an item in the right pane is highlighted with cursor.
Ï
This button is enabled if you highlight an entry in the left pane other than the
one at the top of the list. Click this button to move the highlighted energy group
one place higher in the list. The cursor will also move to the new position.
Ð
This button is enabled if you highlight an entry in the left pane other than the
one at the bottom of the list. Click this button to move the highlighted energy
group one place lower in the list. The cursor will also move to the new
position.
List panes:
Buttons: