Basic Documentation

44 / 46
Siemens VAV compact controller KNX/PL-Link G..B181.1E/KN CE1P3547en
Smart Infrastructure 2021-10-25
9.6 Communication object priorities
The communication objects are prioritized as listed in the table below. An override
signal is active until it is disabled or the HMI/tool is disconnected from the VAV
compact controller. The backup gets disabled when a new setpoint is received or a
power reset is done.
Prio
State
Behavior after power reset
1
Manual gear disengagement
Independent
2
Adaptation run
Will be restarted all over
3
Local override control
Will be reset
4
Remote override position 1
Will be reset
5
Balancing mode
Will be reset
1)
6
Remote override position 2
Will be reset
7
Setpoint
Will be reset
8
Backup mode
Will be reset
1)
Only effective in VAV mode.