6.3 Commissioning
6.3.1 Preconditions
Type and number of parameters that can be set may vary. Prior to commissioning,
all VAV compact controllers must be mounted according to the mounting instruction
M3547 as well as all other devices as per the corresponding mounting instructions.
All devices must be connected to the power supply and bus cabling. Power supply
and bus cabling must be tested.
For KNX installations with multiple lines, it is recommended to do the
commissioning line by line.
After power-up, the device can assume the following states:
State / intended
behavior
User action
Device response (LED)
Functionality available in all system environments
Power-up / device
starts up
Connect device to
power supply
LED is orange / goes off after power-
up is completed
Faultless operation
none
LED is off
Set device to
programming /
addressing mode
Short key press
(<0.5 s)
LED is red (no time limit)
Reset device to
factory settings
Long key press
(>20 s)
LED flashes orange until reset is
completed
Additional functionality available in PL-Link environments only
Execute connection
test
Middle key press
(>2 s and <20 s)
LED flashes orange
Then (each for 60 seconds or prior
cancellation by key press):
a) LED is green connection test
successful
b) LED flashes red (1s interval)
connection test failed
Acknowledge
connection test
Short key press
(<0.5 s)
LED is off
6.3.2 KNX S-mode commissioning
For KNX S-mode, the usual S-mode commissioning procedures with the ETS
software apply. The HMI (push button and LED) conforms to the KNX standard. A
short key press sets the device into programming mode (cf. section 2.4).
Commissioning
requirements
Operating mode and
display