D Working conditions are rendered much more difficult. The stages of work must be
planned and prepared down to the last detail with the customers personnel.
D It may be necessary to use special wiring and installation material
D Time-consuming arrangements have to be made if the customer requests acceptance
test fires.
D etc.
It is therefore very important to check out such details with the customer and the engineer-
ing companies involved in the planning in advance so that such aspects can be suitably
taken into account for the fire detection system project.
The planning engineer who has to approach the customer or the engineering company with
such matters must be highly qualified.