User Manual

Basic Operator Panel 2 (BOP-2)
Operating Instructions, 02/2016, A5E37143404B AA
7
Changes in this manual
1
Important changes with respect to the Manual, Edition 02/2016
Listed below are all the changes that have been implemented in this manual.
The BOP-2 commissioning process
The commissioning process has been significantly enhanced to provide a more efficient
and adaptible commissioning experience. A detailed explanation of the new
commissioning process can be found at the following link:
New commissioning process
(https://support.industry.siemens.com/cs/ww/en/view/109480663)
Safety Notes
The Warning notification and been upgraded to a Danger notification:
Safety notes (Page 11)
Overview
List of compatible products has been updated:
Overview (Page 13)
Menu structure has been updated with the new commissioning process:
Overview (Page 13)
Setup Menu
SINAMICS G120 firmware update information included with links to the Siemens Industry
Online Support site giving detailed information to the nature and extent of the firmware
changes.
New standard commissioning process is explained.
Setup (Page 37)