User Manual
Basic Operator Panel 2 (BOP-2)
Operating Instructions, 02/2016, A5E37143404B AA
7
Changes in this manual
1
Important changes with respect to the Manual, Edition 02/2016
Listed below are all the changes that have been implemented in this manual.
The BOP-2 commissioning process
● The commissioning process has been significantly enhanced to provide a more efficient
and adaptible commissioning experience. A detailed explanation of the new
commissioning process can be found at the following link:
●
New commissioning process
(https://support.industry.siemens.com/cs/ww/en/view/109480663)
Safety Notes
● The Warning notification and been upgraded to a Danger notification:
Safety notes (Page 11)
Overview
● List of compatible products has been updated:
Overview (Page 13)
● Menu structure has been updated with the new commissioning process:
Overview (Page 13)
Setup Menu
● SINAMICS G120 firmware update information included with links to the Siemens Industry
Online Support site giving detailed information to the nature and extent of the firmware
changes.
● New standard commissioning process is explained.
Setup (Page 37)