Operating Instructions
5.5.3 Go online and start the commissioning Wizard
Procedure
1. Select your project and go online:
2. In the following screen form, select the inverter with which you wish to go online.
3. Once you are online, select "Commissioning" → "Commissioning Wizard":
You have started the commissioning Wizard of the inverter.
❒
5.5.4 Commissioning wizard
Select the application class
Procedure
When selecting an application class, the inverter assigns the motor control with the appropriate
default settings:
● [1]
Standard Drive Control (Page 184)
● [2] Dynamic Drive Control (Page 186)
● [0] Expert - or if no application class is listed:
Expert (Page 188)
Commissioning
5.5 Quick commissioning with a PC
Converter with the CU230P-2 Control Units
182 Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257946B AF