Operating Instructions

5. Evaluate your drive response.
If the motor decelerates too slowly, then reduce the ramp-down time.
The minimum ramp-down time that makes sense depends on your particular application.
Depending on the Power Module used, for an excessively short ramp-down time, the
inverter either reaches the motor current, or the DC link voltage in the inverter becomes
too high.
Extend the ramp-down time if the motor is braked too quickly or the inverter goes into
a fault condition when braking.
6. Repeat steps 1 5 until the drive behavior meets the requirements of the machine or plant.
You have set the extended ramp-function generator.
Advanced commissioning
6.16 Setpoint calculation
Converter with the CU230P-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257946B AF 277